CURRENT REGIONAL ENERGY PROJECTS
|
| |
COUNTRY |
|
RE Regional Energy Projects |
| |
Antigua & Barbuda |
|
215,000 Energy Saving Light Bulb program/Cuba (2006)
See CEIS Update June 2006
--------------------------------------------------------------------------------------------------------------------
|
| |
Caribbean Windpower Project (2006) See CEIS Update Mar 2006 |
| |
|
|
|
| |
Bahamas |
|
*National Energy Policy Draft (2007)/BEC/GOB See CEIS Update Sep 2007
------------------------------------------------------------------------------------------------------------------- |
*Appointment of a special committee at Bahamas Electricity Corporation (BEC) to research the most viable renewable energy technologies for the Bahamas at utility
scale/ BEC(2008)
-------------------------------------------------------------------------------------------------------------------- |
*A small biofuel production plant being established in Nassau by Bahamas Waste and Cape Systems and can produce sufficient quantities from used cooking oil to run BEC's diesel vehicle fleet. (2008)
-------------------------------------------------------------------------------------------------------------------- |
BEC to build experimental solar power facilities at its Blue Hills and Clifton Pier sites(2008)
-------------------------------------------------------------------------------------------------------------------- |
Two firms are pursuing multi-million-dollar waste-to-energy projects with the Ministry of Health, which is responsible for landfills and solid waste collection and disposal. (2008) |
|
| |
|
|
|
| |
|
|
Barbados Farms 30MW Co-generation Plant/ Barbados Cane Industry Project/ CCS-EU/CREDP
-------------------------------------------------------------------------------------------------------------------- |
132 million gallon Ethanol Dehydration Plant, Bulk Terminal Facility/ Etanol de Costa Rice SA (2008). See CEIS Update Sep 2008
-------------------------------------------------------------------------------------------------------------------- |
Barbados National Energy Policy Draft launched (2007) See CEIS Update June 2007 & Mar 2007
-------------------------------------------------------------------------------------------------------------------- |
$200 Million for RE Projects See CEIS Update June 2007
-------------------------------------------------------------------------------------------------------------------- |
Solar Water Heater Technicians Workshop/CREDP (2008) See CEIS Update June 2008
-------------------------------------------------------------------------------------------------------------------- |
$100,000 USD PV Pilot Project for studying integration of PV into grid under a “Net Metering Agreement”/ Ministry of Energy/CREDP
-------------------------------------------------------------------------------------------------------------------- |
10 MW Wind Park at Lamberts |
|
| |
|
|
|
| |
Belize |
|
31.5 MW Biogas Cogeneration Plant/ BSI –Belcogen (2006)
--------------------------------------------------------------------------------------------------------------- |
Government Negotiates Ethanol Production Facility/GOB/ Blue Diamond Ventures (2006) See CEIS Update June 2006
--------------------------------------------------------------------------------------------------------------- |
US$25 mill Ethanol Production Project/ Merconsult S.A. and Destillint SA de CV (2007) See CEIS Update Dec 2007
--------------------------------------------------------------------------------------------------------------- |
Belize Energy Saving Light Bulb Project- 150,000 light bulbs (2006)/ GOB See CEIS Update Dec 2006
--------------------------------------------------------------------------------------------------------------- |
25 MW Mollejon Hydro Electric Project/ BEL
--------------------------------------------------------------------------------------------------------------- |
2 MW Hydropower Plant in HydroMaya
--------------------------------------------------------------------------------------------------------------- |
18 MW Vaca Hydropower Dam
--------------------------------------------------------------------------------------------------------------- |
Government of Belize endorsed the formulation of a National Energy Plan for Belize (2004)/ GOB/PUC See CEIS Update Sep/ Dec 2004
back to top |
|
| |
|
|
|
| |
Cuba |
|
Cuba to increase hydropower efficiency in 2008 of it 9 hydropower facilities (combined 110,000 MW) See CEIS Update Mar 2008
--------------------------------------------------------------------------------------------------------------- |
The Renewable Energy Project of the Cuban University of Oriente awarded the World Energy Globe for Sustainability (2007) See CEIS Update Mar 2007
--------------------------------------------------------------------------------------------------------------- |
New 4.5 MW Gibara II Windfarm, Punta Rasa (2008) See CEIS Update June 2008
--------------------------------------------------------------------------------------------------------------- |
1.65 MW Isle of Youth Windfarm
--------------------------------------------------------------------------------------------------------------- |
Gibara I Windfarm
--------------------------------------------------------------------------------------------------------------- |
0.45 MW Turiguano Island Windfarm, Ciego de Avila Province |
|
| |
|
|
|
| |
Curaçao |
|
9 MW Wind Farm |
| |
|
|
|
| |
Dominica |
|
Dominica Coconut Products to Convert to Biofuel Industry Proposal (2007)
---------------------------------------------------------------------------------------------------------------- |
5000 Energy Efficient Lighting Bulb Distribution Project (2006)
---------------------------------------------------------------------------------------------------------------- |
Geothermal Surveys at Scott’s Head/ WIPD (CEIS Update Sep 2008)
---------------------------------------------------------------------------------------------------------------- |
15 MW Geothermal Plant/ WIPD (2010)
---------------------------------------------------------------------------------------------------------------- |
Project Management Unit (PMU) to be established in the Ministry of Public
Utilities, Energy and Ports
---------------------------------------------------------------------------------------------------------------- |
“Preparation of a Geothermal-based Cross Border Electrical Interconnection in the Caribbean”- launched in Dominica (2008-2010). See CEIS Update June 2008
---------------------------------------------------------------------------------------------------------------- |
Establishment of the Independent Regulatory Commission (2007) |
|
| |
|
|
|
| |
Dominican Republic |
|
150 MW Hybrid Energy Centre (announced 2008) See CEIS Update Mar 2008 |
|
| |
|
|
|
| |
Grenada |
|
Geothermal Energy for Grenada resource review initiated in 2008 with initial prefeasibility to be completed in 2009/ GRENLEC
---------------------------------------------------------------------------------------------------------------- |
100-500 kW Hydropower Pilot System
---------------------------------------------------------------------------------------------------------------- |
Government announces plans to become a Sustainable Energy Island (2001) /
GOG See CEIS Update Mar 2002
---------------------------------------------------------------------------------------------------------------- |
50 kWp installed in 18 PV systems (February 2008)/ GRENSOL
---------------------------------------------------------------------------------------------------------------- |
86 kWp installed in 22 PV systems; 55 kWp to be installed until January 2009 (October 2008)
---------------------------------------------------------------------------------------------------------------- |
3 x 2,88 kWp PV-Systems at Point Salines, Grenada/ GRENSOL
---------------------------------------------------------------------------------------------------------------- |
PV- System at Brothers College (PBC) at St. George, Grenada/ GRENSOL
---------------------------------------------------------------------------------------------------------------- |
40 panel 7.2 kWp PV system installed at Hubbard’s Careenage |
|
| |
|
|
|
| |
Guyana |
|
10 MW bagasse fired co-generation, GUYSUCO, Berbice (2008)
---------------------------------------------------------------------------------------------------------------- |
National Edible Oil Company Limited to produce bio-diesel from palm fruits
(2006)/ IAST See CEIS Update Dec 2006
---------------------------------------------------------------------------------------------------------------- |
Ethanol Plant to be constructed by Global Energy Ventures (2007)
See CEIS Update June 2007
---------------------------------------------------------------------------------------------------------------- |
40,000 Energy saving Bulbs Distribution Programme/ Cuba
See CEIS Update Mar 2008
---------------------------------------------------------------------------------------------------------------- |
158 MW Amaila Hydropower Project- Feasibility study and EIA for completed
in 2001. (2008) See CEIS Update Sep 2008
---------------------------------------------------------------------------------------------------------------- |
Russian Entrepreneurs interested in Guyana Oil Prospects
See CEIS Update Mar 2007
---------------------------------------------------------------------------------------------------------------- |
40 portable solar-powered lights, Cheddi Jagan International Airport
(CEIS Update Sep 2008)
---------------------------------------------------------------------------------------------------------------- |
“Capacity Building and Demonstration Projects for Hinterland Unserved Areas Utilizing Renewable Energy Sources” Project/ UNDP (2005). This solar electricity project was implemented in these locations:
- Orinduik (1500W Photovoltaic System)
- Kabakaburi (1500W Photovoltaic System)
- Paruima (1500W Photovoltaic System)
- Kato (1500W Photovoltaic System)
A hinterland electrification project to encompass wind, solar power and biofuels
See CEIS Update Mar 2008 |
back to top
|
| |
|
|
|
| |
Jamaica |
|
Feasibility study into growing sugar-cane for the production of fuel-grade
ethanol for the local gasoline market.(2004) See CEIS Update Sept/Dec 2004
---------------------------------------------------------------------------------------------------------------- |
Ethanol Blend in Motor Vehicle Assessment Pilot Project/PCJ (2006)
See CEIS Update June 2006
---------------------------------------------------------------------------------------------------------------- |
1 KW Bio-digester located on Silverdene Broiler Farms, Linstead, St. Catherine/ PennState/UTECH (2004) See CEIS Update Mar 2008
---------------------------------------------------------------------------------------------------------------- |
US$7.34 million Rehabilitation of Petrojam Ethanol with COIMEZ (2004)
---------------------------------------------------------------------------------------------------------------- |
E10 (Ethanol Blend) Roll Out (2008)/PCJ/Petrojam See CEIS Update Mar 2008
---------------------------------------------------------------------------------------------------------------- |
120-million gallon ethanol plant/ Energen Development Ltd (2008)
See CEIS Update Mar 2007
---------------------------------------------------------------------------------------------------------------- |
20-30 million gallon bio-diesel plant and cogeneration facility/ Energen
See CEIS Update Mar 2007
---------------------------------------------------------------------------------------------------------------- |
PCJ and UWI Partnership for New Certificate Course in Alternative
Energy (2005) See CEIS Update June 2005
---------------------------------------------------------------------------------------------------------------- |
PCJ and UWI sign MOU for Collaborative research in Alternative Energy
(2008) See CEIS Update Sep 2008
---------------------------------------------------------------------------------------------------------------- |
5- day Comprehensive Program for Energy Managers in Jamaica on
(March 2005)./ PCJ/EAST/AEE See CEIS Update Mar 2005
---------------------------------------------------------------------------------------------------------------- |
Energy Policy to be promulgated March 31, 2008 See CEIS Update Mar 2008
---------------------------------------------------------------------------------------------------------------- |
National Building Code to ensure Energy Savings/UTECH (2008)
---------------------------------------------------------------------------------------------------------------- |
MOU to Launch Caribbean Information Platform on Renewable Energy/
CEIS /CARICOM (2008-2009)
---------------------------------------------------------------------------------------------------------------- |
National Energy Policy (2006-2020)
---------------------------------------------------------------------------------------------------------------- |
Island-wide energy audits for 23 hospitals/ ECOTEC/PCJ
----------------------------------------------------------------------------------------------------------------- |
$800,000 Solar Water Heating System for Princess Margaret hospital,
St. Thomas/ PCJ (2005) See CEIS Update June 2005
---------------------------------------------------------------------------------------------------------------- |
PCJ launches solar panel mascot Solar Man (2006)
---------------------------------------------------------------------------------------------------------------- |
Irwin High School PV System- 5,280 Watts installed solar system with
48 panels installed that offset 10,585 KWh per year, approximately 25%
of the school’s total electricity use./ ECOTEC (2008)
---------------------------------------------------------------------------------------------------------------- |
BOTSU Ltd. Negril: Off the grid solar system, 3,520 Watt installed (32
panels) that generates 7, 066 KWh per year and supplies all the energy/ ECOTEC
---------------------------------------------------------------------------------------------------------------- |
18MW Expansion of Wigton Wind farm (2008-2010).
See CEIS Update Sep 2008
back to top |
|
| |
|
|
|
| |
Montserrat |
|
Feasibility study into 900 MW geothermal potential
---------------------------------------------------------------------------------------------------------------- |
Feasibility study into hydro schemes
---------------------------------------------------------------------------------------------------------------- |
Applications for Solar Water Heating and PV for Distributed Electricity Generation |
|
| |
|
|
|
| |
St. Lucia |
|
Assessment for Grid-tied 400 KW Ciceron Landfill Gas-to-Energy Project
--------------------------------------------------------------------------------------------------------------- |
Biogas Production from the Beausejour Agricultural Meat processing
Facility, Viex-Fort
--------------------------------------------------------------------------------------------------------------- |
Draft Geothermal Bill in the House of Parliament in Nevis (2008)
--------------------------------------------------------------------------------------------------------------- |
Sol Lucia founded with Partner (GUL) in St. Lucia (March 2008)/GRENSOL
--------------------------------------------------------------------------------------------------------------- |
Solar Lighting Demonstration Project (2000)/ Italian Government
--------------------------------------------------------------------------------------------------------------- |
Solar Powered Ferry, Discovery Hotel, Mangot Bay (2007)
--------------------------------------------------------------------------------------------------------------- |
12.6 MW Wind Park, Sugar Mill
--------------------------------------------------------------------------------------------------------------- |
4.25MW Windfarm, Point de Caille/ LUCELEC |
|
| |
|
|
|
| |
St. Kitts & Nevis |
|
Feasibility Study on Biomass and Waste-to-Energy (2008)
--------------------------------------------------------------------------------------------------------------- |
Biomass and Waste-to-Energy Project (2009-2010)
--------------------------------------------------------------------------------------------------------------- |
Exploratory works for geothermal energy on Nevis/ TIC (2008) See CEIS
Update June 2008
--------------------------------------------------------------------------------------------------------------- |
Nevis Island Administration developing legislative framework to govern
geothermal energy (2008) See CEIS Update June 2008
--------------------------------------------------------------------------------------------------------------- |
900 MW Geothermal Project (2010) See CEIS Update Mar 2008
--------------------------------------------------------------------------------------------------------------- |
10kWh (480 sq.ft) Solar panel, ICT Centre (2008)
--------------------------------------------------------------------------------------------------------------- |
10 MW Wind Farm, St. Kitts |
|
| |
|
|
|
| |
St. Vincent & the Grenadines |
|
St. Vincent & Guyana Jatropha for Biofuel Cooperation (2007)
-------------------------------------------------------------------------------------------------------------- |
Greening Hotels Project (2007)
-------------------------------------------------------------------------------------------------------------- |
3.24 kWp grid-connected PV System in St. Vincent (Technical College)
(March 2008)/GRENSOL
-------------------------------------------------------------------------------------------------------------- |
7.2 MW Wind park at Ribishi Point (2007)/ VINLEC. Financing offer to
include hydropower as well.
-------------------------------------------------------------------------------------------------------------- |
6 to 8 MW Grid-connected Wind Park Call for Interest (2008)
-------------------------------------------------------------------------------------------------------------- |
5.4 MW Wind Park in Grid-Parallel Operation, Ribishi Point (2009) |
|
| |
|
|
|
| |
Suriname |
|
Suriname Oil Company Signs Productions –Sharing Contracts with Irish Oil Producer See CEIS Update Mar 2007 |
|
| |
|
|
|
| |
Trinidad & Tobago |
|
T&T’s first “smart and green” sustainable commercial building located at Wallerfield, Trinidad to bee completed 2008
-------------------------------------------------------------------------------------------------------------- |
PV systems for rural areas/ TTEC (2005)
-------------------------------------------------------------------------------------------------------------- |
Pilot Solar Water Heating Project, Tobago
-------------------------------------------------------------------------------------------------------------- |
Small Hybrid-Wind/PV System for remote area, Tobago |
|
| |
|
|
|
| |
Turks & Caicos |
|
Train a core team of indigenous RE staff in Grand Turk by 2009/ WRB
--------------------------------------------------------------------------------------------------------------- |
25 kW Wind turbine |
|
| |
|
|
|
| |
GSEII |
|
Bringing Renewable Energy Efficiency Projects to the Caribbean (2003-2008) |
| |
|
|
|
| |
Geo-Caribes |
|
“The Eastern Caribbean Geothermal Development” Project- St. Lucia, Dominica
and St. Kitts and Nevis (2005)
|
| |
|
|
|
GOING GLOBAL |
| |
|
|
|
| |
Indonesia |
Iceland |
New Zealand |
Italy
|
Spain
|
Germany
|
China |
|
|
60 MW geothermal plant, Java, Indonesia (2008)
---------------------------------------------------------------------------------------------------------------- |
5-50 MW geothermal plant
---------------------------------------------------------------------------------------------------------------- |
60 MW geothermal plant, Tauhara
---------------------------------------------------------------------------------------------------------------- |
10 kW Building-Integrated- PV forming an integral component for a
25,000 sq. m green building project I Sicilia
---------------------------------------------------------------------------------------------------------------- |
462 PV Panels installed on mausoleums of town’s cemetery powers 60 homes,
Santa Coloma de Gramenet, (2008)
----------------------------------------------------------------------------------------------------------------- |
5 MWp in Burstadt- World’s-largest roof top plant; April 2005 grid-connected
(40,000 m2 total surface area)
---------------------------------------------------------------------------------------------------------------- |
800 kWp for Airport installation in Wuxi |
|
| |
|
|
|
| |
|
|
|
| |
|